Create a Commitment Change Order

Modified on Tue, 5 Aug, 2025 at 2:21 AM

The 'Change Order' interface lets the contractors and vendors create a commitment change order for various reasons, such as changes to the commitment on in-scope work. 

General Contractor

  • Add their own estimates for the change and obtain approval from the owner. This is useful for any self-performed work of change orders created for budget revisions.  

Subcontractor

  • Add their own estimate for the change and forward it to the general contractor for review and approval.  
  • The GC reviews and finalizes the change order after getting approval from the required owner/stakeholders.
Roles and Permissions:
Only users with roles having 'Create,' 'Maintain,' or 'Manage' permission enabled for the change order module can create draft change orders.

Creating a commitment change order involves the following steps:

Step1 - Create a Commitment CO

  • Ensure that you are on the change order module of the project's management console. If not:
    • Click the app launcherand select 'Finance.' and click 'Change Order' on the top
  • Select 'Boards' on the left.
  • Click the '+ Create CO' button on the top right.

The change order creation wizard starts:

  • Choose 'Commitment' at the top
  • Enter the details:
    • Change Order Title - A label for the CO shortly describing it (Max. 255 characters)
    • CO Type - Choose the type of the CO based on its reason 
    • CO Sub Type - Select the sub-classification depending on the chosen type
    • Priority - Specify the criticality of the CO
    • Sequence - Specify the category of the change order as classified as per your company practices. The change order will be numbered in a series, depending upon the category. This numbering lets you quickly identify, filter/review change orders of a particular type.
  • Click 'Create'

 The change order opens at the 'Details' tab for adding more particulars:

The screen contains four tabs:

  • Details - Add plan sheet and spec book references, add the description for the change required, attach RFI/punch list items, and more. You can also add your colleagues to be notified of the progress of the CO, as watchers.  The 'Activity Log' at the top right shows the history of actions on the CO.
  • My Estimate - Add your estimate/bid for the work involved in the change. This is mandatory for SCs and optional for general contractors. GCs can upload their estimates for any self-performed work.
  • Work Cost - Applies only to General contractors - Request bids from the subcontractors for the change work and process them.
  • Final Cost - Applies only to General contractors - Add any further cost to the quote from the accepted bid and approve the CO.

Step 2 - Add more details, the description, and watchers

The mandatory fields in the 'Details' page are inherited from the details entered in the previous step. You can set a due date and add optional details and a description of the change work with supporting attachments. If the change order results from one or more RFIs / punch list items, you can attach them to your description. 

Ensure that you are in the 'Details' tab and add the following details:

  • Due date - The date before which the change order should be closed. Use the calendar and specify the due date for the CO. 
  • Specification Code - The section in the project spec book related to the tasks and deliverables involved in the change work. Select the spec code from the drop-down. 
  • Sheet No. - The plan sheet reference to the change work. Choose the plan sheet number from the drop-down 
  • Location - The location of the constructed structure for which clarification is needed. You can specify the spot from the list of locations defined for the project. As a prerequisite, the project should have been uploaded with a hierarchical list of locations. See Add Multi-Tiered Locations to a Project for more details.

To add the location

  • Click inside the location field

The 'Select Location' pop-up shows the hierarchically nested locations defined for the project

  • Use the right arrows beside the parent-level items to expand them as required
  • Select the location by clicking its serial number and clicking 'Ok'
  • Description- Enter a description explaining the change work in detail. 
    • Use the tools on the top to format your text and add emojis, insert hyperlinks, tables, etc.
    • Click the paper clip icon to add attachments to your description
    • Click 'Save'
    • You can edit the description at any time before you route the CO to the next step
  • Attachments - Click on the top right to add attachments like photos and documents to the description.
  • Linked Items - Click 'Link Item' on the right to add related plan drawings, schedule items, budget items and project documents like RFI, submittals, punchlists etc., related to the change order. 
  • Click '+Link items' to attach links to items like Submittals, RFIs, plan sheets, plan markups, scheduled tasks, punchlist items, etc., to the Change Order
  • Choose the type of item from the drop-down at the top

  • Select the item to link
  • Click 'Add'
  • Repeat the process to link more items as required

Notes on Plan drawings and plan markups:

You can link plan drawings with or without markups, or already existing markups, to the change order. The linked plan drawings are also added as image attachments to the description automatically.  

Plan drawings with or without markups:

  • Choose 'Plans' in the link items drop-down menu
  • The plan drawings added for the project are shown:

  • To add a plan sheet, select the plan you want to use by clicking the check box on its left, and click the 'Add' button
  • To create a new markup to illustrate your change order, click 'Add markup' on the left. See Markups for guidance on creating different types of markups on the plan drawing.
  • Enter a name for the markup and click 'Ok' to add the newly created markup to the change order.
  • Repeat the process to add more plan drawings.

Plan markups

  • Choose 'Plan Markups' in the link items drop-down menu
  • The list of plan markups added to various plan drawings for the project are shown
  • Select the markup and click the 'Add button'
  • Repeat the process to add more markups

Add Supporting Attachments

  • Click '+ Attachments' at the bottom-left of the field to add attachments like photos, images, and/or other document files to your Change Order:

  • To attach an item from your device, select 'Upload' and drag and drop the file to the right pane
  • Alternatively, click 'Browse' and navigate to the required file
  • To attach an item from the project's file repository, choose an option on the left from Company Drive, Project Drive, or System Drive
    • Navigate to the item you want to upload

Custom Fields - The 'Custom Fields' section includes any extra fields added by your administrator to capture specific details about the change order. These fields may be designated as optional or mandatory, depending on the administrator's settings. An example is shown below:

The next step is adding watchers (optional).

Add Watchers

The 'Watchers' pane allows you to specify your team members to notify them of the change order progress and details. Linarc sends a notification to the persons on each activity on the change order. If given access, they can view the details at each step from their Linarc project consoles.

  • Start typing the name of the person in the text field under 'Watchers' and choose from the options

  • Click 'Add'
  • Repeat the process to add more watchers

Step 3 - Add your estimate

The 'My Estimate' tab lets you add your estimate for the change order.

You can submit your estimate in two ways:

Create your estimate

  • Click the 'My Estimate' tab

  •  Click 'Create'

  • Each line in the file should contain one task entry. 
  • Enter the values for the tasks under the following column headers. 
    • Task - The cost code of the line item. Typically, this is the standard code for the task or deliverable as per CSI MasterFormat. If your company uses a custom coding system, enter the code as per your company's task code format. Contact your administrator for more details.
      • Click inside the cell and select the code from the drop-down
  • Double-click inside a cell to enter the following values. Enter the monetary values in US dollars.
    • Name - The label of the task or deliverable
    • Qty - The amount of work done by the task 
    • Unit - The unit by which the amount of work done is measured 
    • Hrs - The period required for completion of the task in manhours
    • Labor$ - The manual labor cost estimated for the job
    • Equip$ - The estimate of cost incurred by the use of equipment and machinery for the work
    • Sub$ - Expenses related to external subcontracts, if any. 
    • Mat$ - Cost incurred by the materials used for the work 
    • Other$ - Miscellaneous expenses like transportation, material handling, fees paid to various vendors, agencies, and more.  
    • Oh$ - Overhead and operation costs that the company bears, relevant to the task
    • Profit$ - The profit expected from the work
    • Total$ - Auto-calculated from the values in the row
  • Click '+Add Row' to add more line items
  • Click 'Save' to save your draft

You can edit the values before submission. Click here to know more.

Upload your estimate

  • Click the 'My Estimate' tab
  • Click 'Download' at the bottom right to obtain a blank Excel file containing the required field headers. 

Requirements of the estimate file

  • The Excel file should contain an exhaustive list of tasks for the completion of the change work. 
  • Each line in the file should contain one task entry.
  • Enter the values for the tasks under the following column headers. Enter the monetary values in US dollars. 
    • Task Code - The cost code of the line item. Typically, this is the standard code for the task or deliverable as per CSI MasterFormat. If your company uses a custom coding system, enter the code as per your company's task code format. Ensure that the task codes entered here are included in the task code list of your company. Contact your administrator for more details.
    • Task Name - The label of the task or deliverable
    • Estimate Time - The period required for completion of the task in days
    • Estimate Labor - The manual labor cost estimated for the job
    • Estimate Equipment - The estimate of cost incurred by the use of equipment and machinery for the work
    • Estimate Subcontractor - Expenses related to subcontracts, if any.
    • Estimate Material - Cost incurred by the materials used for the work
    • Estimate Others - Miscellaneous expenses like transportation, material handling, fees paid to various vendors, agencies, and more. 
    • Quantity - The amount of work done by the task
    • Unit - Units by which the amount of work done is measured
    • Overhead - Operation costs that the company bears
    • Profit - The profit expected from the work
  • Save the Excel file with an appropriate name.
  • Upload or drag and drop the file.

Your entries are validated and added to the draft list if there are no errors in them.

Tip: The entries with errors, for example, the task codes, are shown in red. You can directly double-click on the item and edit it.
  • Click 'Save'

The draft estimate is shown:

  • Review your draft estimate
    • Use the toggle switch at the top right to switch between the detailed view and the summary view
    • Click 'Reupload' and repeat the process if you want to present a revised estimate
  • Click 'Submit' to upload your estimate

Estimate Details:

The estimate details text box opens as soon as you submit your estimate file. You can enter the details and descriptions for your estimate and add supporting documents and photos.

  • Click the text box and start typing your description.
  • Click on the top right to add attachments like photos, images, and/or other document files to your description.

Next step:

Tip:
You can chat with the team members and the participants of the change order at any stage. Click the button on the top right. See Chat and collaborate on a CO for more guidance.

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article