Generate PDF version of a Change Order

Modified on Fri, 7 Nov at 2:15 AM

You can generate a PDF version of a Change Order at any stage, capturing all current details in a professional, shareable format.

  • Comprehensive content: Automatically include all details, estimates, final cost details, etc., added to the change order till the date.

  • This is useful for record-keeping and sharing the change at any stage.

PDF Template: Linarc ensures every Change Order PDF is generated as a professional, standardized document.
  • Active template: PDF output is based on the active template defined at the project portfolio level
  • Customizable output: Linarc ships with a predefined library of default templates, with one set as active for the starting point. You can design a branded template that match company policies and set it as active for Change Order PDFs, to override the system default.
  • Flexible setup: Generate customized template from scratch or adapted by cloning and modifying a Linarc-provided template.
See PDF Templates – Overview for complete setup details.

To create and download the PDF version

  • Open the change order if not already done. To do so:
    • Open the project management console
    • Click the app launcher icon in the top-right and select 'Finance'
    • Click 'Change Order' on the top, then choose 'Boards'
    • Click on the CO card
  • Click the 'Download PDF' button at the top-right

The 'Downloads' pane displays a list of any previously generated PDF files for the CO, if any, providing quick access to past versions for reference or review. 

The process involves two steps:

Generate the PDF file

By default, any newly generated PDF includes all sections of the change order. However, you can customize the PDF by selecting specific sections to include. This allows you to highlight only the relevant information for sharing while excluding any sensitive content, if applicable. 

Note: The PDF includes an Activity Log section that lists actions taken by different parties on the change order. This section is excluded by default. To include the Activity Log, opt for custom version and select it.

To generate the full version

  • Click 'Generate'

The system compiles the PDF version of the CO, including all estimates and attachments included till the current point in time. The process takes around 30 seconds. The output PDF contains all sections, excluding the activity log of the CO. You can view/download the PDF from the same pane.

Download the PDF file

To view/download the PDF

  • Reopen the 'Downloads' pane by clicking the 'PDF' button.

The recently created PDF file is shown at the top of the list if there are multiple items.

  • Click  to open the file in a new browser tab.
  • Click  to download it.

  • File Name - The filename is automatically set to the name of the CO. Enter your preferred name in the text box to override the default.
  • Click the 'Direct Download' button to save the file directly to your device.

You can also save the file on Linarc's cloud-based project file repository. This allows you to share it with other team members. The folder's access permissions determine which team members can view or edit the file.

  • Company Drive- Share with the project team members from your organization:
    • Select the folder that corresponds to your company name
    • Navigate to the desired folder and click 'Save.'
  • Project Drive- Share with the construction team members from any stakeholder organization: 
    • Select 'Project Drive'.
    • Navigate to the appropriate folder and click 'Save.'

You can share the PDF with any external collaborator by instantly composing an email and attaching the PDF file to it. See Email a change order to External Stakeholders for more details.

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article